Online MEPCO Bill — Check Your MEPCO Electricity Bill Online
MEPCO Helpline: 118 Multan, Bahawalpur, D.G.Khan & Sahiwal Regions
MEPCO Load Shedding Schedule 2026 — Check Feeder Timings Online | Online MEPCO Bill
Load Shedding Schedule

Check Your MEPCO Load Shedding Schedule

Outage timings are feeder-specific, not city-wide — search by your reference number, or by city, grid and feeder, to see the exact schedule for your connection.

Find this on any previous MEPCO bill, top-left corner.

Less precise than your reference number — feeders can share area names.

Why It's Not City-Wide

Two streets, two very different schedules

MEPCO's load shedding is organized by feeder — the specific line serving your neighborhood — not by city or town.

Feeder-based, not area-based

Your neighbourhood is served by one specific feeder line. Nearby streets on a different feeder can have a completely different schedule.

Loss & recovery based categorization

Feeders with higher line losses or lower bill payment recovery are typically scheduled for longer outage windows under NEPRA's differential policy.

Schedules shift with demand

Timings are reviewed and can change based on seasonal demand, maintenance work, and generation availability.

Feeder A — Low LossShorter Hours
Feeder B — Medium LossModerate Hours
Feeder C — High LossLonger Hours

Illustrative categories — your feeder's actual classification and hours are shown on the official CCMS Feeder Details page.

Know the Difference

Scheduled outage or a fault?

Not every power cut is load shedding — knowing which one you're facing determines what to do next.

✓ Scheduled Load Shedding

  • Happens at the times shown on your feeder's published schedule.
  • Affects your whole feeder, not just your house.
  • No action needed — power resumes automatically at the scheduled time.

⚠ Unscheduled Outage / Fault

  • Happens outside the published schedule, often just your street or house.
  • Could be a tripped breaker, damaged line, or transformer fault.
  • Should be reported so it's treated as a fault, not assumed as scheduled.
Report an Outage
FAQs

Load shedding questions, answered

Enter your 14-digit reference number, or search by city, grid, or feeder, on the official CCMS Feeder Details portal. The schedule shown is specific to the feeder that serves your connection, not your entire city.

MEPCO's load shedding schedule is feeder-based, not area-based. Two streets close to each other can be served by different feeders, each with its own loss percentage, recovery rate, and outage timetable.

Under NEPRA's differential load shedding policy, feeders with higher line losses or lower bill recovery rates are typically scheduled for longer outage windows than well-performing feeders.

An outage outside the published schedule is usually a fault rather than planned load shedding. Report it through the complaint helpline so it's treated as a supply fault rather than assumed to be scheduled.

Some subdivision offices offer SMS registration for billing and outage updates. Availability varies by area — check with your local MEPCO sub-division office to register your mobile number.

Don't trust forwarded WhatsApp schedules. Unofficial schedules circulating in local groups are frequently outdated or simply wrong. Always confirm against the official CCMS Feeder Details page for your reference number.

Scroll to Top